HOW TO INSTALL A 200 AMP ELECTRICAL SERVICE the trench bring the power tothe conduit at the base of the service entrance. Underground Service, Flush-Mount Meter . Figure 3-5. Underground service to a flush-mount meter. Figure 3-5 shows a finished underground installation with the meter mounted flush with the surface of the building. Flush-mount meters are sometimes in- stalled for aesthetic reasons. The service is underground from the

Installation Manual Three Phase Energy Meter

Net Metering Meralco. METER INSPECT PROCEDURE. R epublic of the P hilippines ENERGY REGULATORY COMMISSION. A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life., • Check installation, and install tamper seals and secure electronic settings that may alter the accuracy and integrity of the meter and associated devices. • Record initial flow meter reading at time of installation. • Record all measurement and configuration data used in flow computer and make this information available for future use..

Meter base can be used with services where the main breaker is rated at 225, 250 or 300 amps, or with no more than two breaker panels whose combined main breaker rating does not exceed 400 amps. On all underground installations the bottom of the meter base must remain clear to allow for EMCEMC conductors to be installed. This stage includes an inspection of the Service Entrance depending on the meter set-up (2 uni-directional meter or single bi-directional meter). A Certificate of Final Electrical Inspection (CFEI), to be obtained from the city or municipality, may be required on a case-to-case basis.

Meter base can be used with services where the main breaker is rated at 225, 250 or 300 amps, or with no more than two breaker panels whose combined main breaker rating does not exceed 400 amps. On all underground installations the bottom of the meter base must remain clear to allow for EMCEMC conductors to be installed. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company.

ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and … Thank you for your interest in instituting good governance practice in Meralco . If you are aware of any violation of the following corporate governance rules, committed by any our directors, officers or employees, related to the following:

* Applications with more than 5KW of applied load need to be computed and formalized by a Meralco representative. Please note that the bill deposit amount may be adjusted yearly to reflect the close average monthly bill of the customer. The adjustment mechanism is covered by Meralco’s Annual Update of Bill Deposit (AUBD) program. REQUIREMENTS Net Metering Zero Export; DEFINITION: A program under the Renewable Energy Act carried out by the Energy Regulatory Commission (ERC)that allows customers who install RE facility within their premises with a capacity of up to 100kW, to export excess electricity to the distribution utility, i.e. Meralco.

Electrical Design Standards Meter base can be used with services where the main breaker is rated at 225, 250 or 300 amps, or with no more than two breaker panels whose combined main breaker rating does not exceed 400 amps. On all underground installations the bottom of the meter base must remain clear to allow for EMCEMC conductors to be installed.

REQUIREMENTS Net Metering Zero Export; DEFINITION: A program under the Renewable Energy Act carried out by the Energy Regulatory Commission (ERC)that allows customers who install RE facility within their premises with a capacity of up to 100kW, to export excess electricity to the distribution utility, i.e. Meralco. Meter base can be used with services where the main breaker is rated at 225, 250 or 300 amps, or with no more than two breaker panels whose combined main breaker rating does not exceed 400 amps. On all underground installations the bottom of the meter base must remain clear to allow for EMCEMC conductors to be installed.

Wiring a meter base is the responsibility of a homeowner. Some utility companies may supply the meter base and some will not. In most cases, only the service drop and meter are installed by the utility company. The meter socket, wiring and all the fittings are the responsibility of the owner as well. Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash

2. The District must approve all meter locations prior to installation. (WAC 296-46B-230). 3. Where multiple meter bases serving the same address or where confusion could exist which meter serves what, such as apartment houses, commercial businesses, solar generation and other situations all meter bases shall be permanently labeled as Wiring a meter base is the responsibility of a homeowner. Some utility companies may supply the meter base and some will not. In most cases, only the service drop and meter are installed by the utility company. The meter socket, wiring and all the fittings are the responsibility of the owner as well.

Electrical Design Standards 11/08/2014В В· Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit...

How to Apply for Meralco Meter and Requirements Random 43 Comments If you have a new house or a house that still doesn’t have an electric meter from Meralco, chances are you wondering what are the requirements or qualification to get one. Meralco can help you monitor your solar installation through Net-Metering, a program under RA 9513, the Renewable Energy (RE) Act that allows customers to install an RE facility within their premises up to a capacity of 100kW. Any excess electricity not consumed in the home or business is exported to a distribution utility (in this case

Always Check Service Entrances For Electricity And Water

Meralco meter base installation guide

Section 5 Meters and Service Entrance Equipment. This stage includes an inspection of the Service Entrance depending on the meter set-up (2 uni-directional meter or single bi-directional meter). A Certificate of Final Electrical Inspection (CFEI), to be obtained from the city or municipality, may be required on a case-to-case basis., Meter Base Specifications. Home / Customer Service / Meter Base Specifications; Below is a list of ED2 specifications for typical, single phase, residential meter base installations. These specifications will assist you in ensuring that your new service will pass inspection. Feel free to print them out. Please keep in mind that the Electrical Inspector in your area may have additional.

Wiring Utility Controlled Meter-base Wiring a New Main. See below for our ASSEMBLY GUIDE FOR METER POLE INSTALLATION. Meter base mounted on exterior wall of house or mobile/manufactured home. For overhead service, weather head must be a minimum of three feet above the roof. For underground service, the poured footing must be …, A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process..

How to Install Meter Base Wiring eHow

Meralco meter base installation guide

Net Metering Meralco. In certain situations wherein the customer has a temporary service connection, there will be an installation and removal cost for the temporary electric facility structure. 5. Meralco installs meter and/or additional facilities and energizes your electric service. OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07в€’01в€’14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application..

Meralco meter base installation guide


HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company.

HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or I just realized something when I inspected a foreclosed property recently and I would like to share it here. While doing inspections of foreclosed properties as part of due diligence, you should always check the condition of the service entrances for utilities like the electricity and water.

Project-Covered Application (PCA) – involves the installation of additional Meralco facilities, such as poles, transformers, and lines, to provide the customer power requirements. This involves a design of facilities process, which both Meralco and customer should agree before starting with the construction. CT’s, or current transformers, and PT’s, or potential transformers are used in metering to step down current and voltage to safer and more manageable levels. Many people want to know what is a current transformer and potential transformer. Here I will try to demystify the CT PT confusion. One thing… Continue reading

Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash A meter socket houses the electricity for the meter for your home and can also be known as a meter base. The meter itself is provided by your utility company and used to calculate your monthly bills. Individual states may have slightly different legislation about requirements for the meter socket

10/01/2018 · Disclaimer : This video is just an overview of the installation, be sure to consult your local electrician / engineer before doing any upgrades or improvements to your property. This video shows MERALCO AGENCY – Proceed to MERALCO AGENCY @ LV2 Move In Office – Bahay Kubo. 4. SUBMIT – Submit required documents. 5. EVALUATION – Meralco will evaluate and approve immediately if docs are okey. 6. PAY – When approve, pay application fee Php 3,250.00. 7. TIME – 45 days. Author's page Lancaster Cavite. Lancaster Cavite offers affordable houses for sale in Lancaster New City, a

A meter socket houses the electricity for the meter for your home and can also be known as a meter base. The meter itself is provided by your utility company and used to calculate your monthly bills. Individual states may have slightly different legislation about requirements for the meter socket Meter Base Guide. Do you need to have your meter base repaired? Need to install a new meter base? Has the city or the electricity provider notified you that your meter base needs to be repaired or upgraded? Nisat Electric can help! Many people are confused about the meter base and the electrical service panel. The meter base is the enclosure

Energy UK: Guidance for electricity & gas meter installation consumer facing issues Page 1 of 57 Guidance for Electricity and Gas Meter Installation Consumer Facing Issues A guide for meter operatives on how to act and actions to take when identifying consumer facing issues May 2015 Energy UK Version: v 1.0 Status: Final published "Meter" - a device for measuring the electric power and energy supplied to a customer. 22. "Meter Enclosure" - a wood or metal cabinet, or metal socket, installed indoors or outdoors, in which the Company's metering equipment is located. 23. "Meter Sockets" - a meter socket is the base portion of a socket type meter. There

OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07в€’01в€’14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application. the trench bring the power tothe conduit at the base of the service entrance. Underground Service, Flush-Mount Meter . Figure 3-5. Underground service to a flush-mount meter. Figure 3-5 shows a finished underground installation with the meter mounted flush with the surface of the building. Flush-mount meters are sometimes in- stalled for aesthetic reasons. The service is underground from the

ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and … 11/08/2014 · Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit...

MERALCO AGENCY – Proceed to MERALCO AGENCY @ LV2 Move In Office – Bahay Kubo. 4. SUBMIT – Submit required documents. 5. EVALUATION – Meralco will evaluate and approve immediately if docs are okey. 6. PAY – When approve, pay application fee Php 3,250.00. 7. TIME – 45 days. Author's page Lancaster Cavite. Lancaster Cavite offers affordable houses for sale in Lancaster New City, a HIGH RISE METERING & MULTI-FLOOR INFRASTRUCTURE REQUIREMENTS A High Rise building is defined as a building larger than three stories. Meter rooms located inside shall be approved by NES Meter Department during the design phase, or

Meralco meter base installation guide

Meralco can help you monitor your solar installation through Net-Metering, a program under RA 9513, the Renewable Energy (RE) Act that allows customers to install an RE facility within their premises up to a capacity of 100kW. Any excess electricity not consumed in the home or business is exported to a distribution utility (in this case 10/01/2018В В· Disclaimer : This video is just an overview of the installation, be sure to consult your local electrician / engineer before doing any upgrades or improvements to your property. This video shows

How to Apply for Meralco Meter and Requirements Guide

Meralco meter base installation guide

Electrical Meter Base Upgrade And Installation Part 1. In certain situations wherein the customer has a temporary service connection, there will be an installation and removal cost for the temporary electric facility structure. 5. Meralco installs meter and/or additional facilities and energizes your electric service., Meter Base Guide. Do you need to have your meter base repaired? Need to install a new meter base? Has the city or the electricity provider notified you that your meter base needs to be repaired or upgraded? Nisat Electric can help! Many people are confused about the meter base and the electrical service panel. The meter base is the enclosure.

HOW TO INSTALL A 200 AMP ELECTRICAL SERVICE

Electric Meter Socket Meter Mounting Equipment Eaton. Meralco can help you monitor your solar installation through Net-Metering, a program under RA 9513, the Renewable Energy (RE) Act that allows customers to install an RE facility within their premises up to a capacity of 100kW. Any excess electricity not consumed in the home or business is exported to a distribution utility (in this case, REQUIREMENTS Net Metering Zero Export; DEFINITION: A program under the Renewable Energy Act carried out by the Energy Regulatory Commission (ERC)that allows customers who install RE facility within their premises with a capacity of up to 100kW, to export excess electricity to the distribution utility, i.e. Meralco..

Who would be interested in the pictures of electric meters? I do not know either. However, electric meters are an important component in electrical installations. That is how the energy consumed by an installation is measured and recorded. With this record, the owner of a factory, as an example, can be charged for what he uses. Eaton is your one-stop shop for the widest range of residential and light commercial electric meter sockets in the industry. These single-socket surface- or flush-mount outdoor enclosures come in two styles, allowing for both easy, cost-saving installation, and for the use of BR- or CH-type branch breakers. The one-piece, die-run electric meter socket enclosures eliminate tampering and extend

10/01/2018В В· Disclaimer : This video is just an overview of the installation, be sure to consult your local electrician / engineer before doing any upgrades or improvements to your property. This video shows 2. The District must approve all meter locations prior to installation. (WAC 296-46B-230). 3. Where multiple meter bases serving the same address or where confusion could exist which meter serves what, such as apartment houses, commercial businesses, solar generation and other situations all meter bases shall be permanently labeled as

Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash Meter Base Installation Guides. 100 AMP / 200 AMP Overhead Service Installation (Hollywood Riser / Weatherhead Setup) 60 AMP Overhead Temporary Construction Service Installation 100 AMP Mobile Home Overhead Meter Pole Installation. 200 AMP Overhead Meter Pole Installation. Underground - H Structure Service Installation . 100 AMP / 200 AMP Underground Service Installation (On House) 400 …

7.0 METER INSTALLATIONS SUMMARY OF SIGNIFICANT CHANGES TO THIS GUIDE (June 2019) Significant changes to the text from the last published version are identified in this document by a vertical bar in the left-hand margin (see example in the left margin of this paragraph). Additionally, significant changes to the text (by section) and to the exhibits (by exhibit) are summarized below: Section A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process.

10/01/2018 · Disclaimer : This video is just an overview of the installation, be sure to consult your local electrician / engineer before doing any upgrades or improvements to your property. This video shows Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash

SERVICE EQUIPMENT 5-1-1 SEPT 2015 SIM-ESIG SIM-ESIG: 5-1 METER AND SERVICE EQUIPMENT 1. General Rules and Regulations. (a) To avoid unnecessary delay or expense, the customer or the customer’s representative shall consult the appropriate DTE Electric Service Center before starting any wiring. (See pages 1-2-1 through 1-2-4 for Service Center locations.) REQUIREMENTS Net Metering Zero Export; DEFINITION: A program under the Renewable Energy Act carried out by the Energy Regulatory Commission (ERC)that allows customers who install RE facility within their premises with a capacity of up to 100kW, to export excess electricity to the distribution utility, i.e. Meralco.

11/08/2014В В· Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit... Wiring a meter base is the responsibility of a homeowner. Some utility companies may supply the meter base and some will not. In most cases, only the service drop and meter are installed by the utility company. The meter socket, wiring and all the fittings are the responsibility of the owner as well.

Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company. Electric house meters can only be installed by power companies. Homeowners, however, can install the meter base. The electrical meter is part of a meter loop, which also contains a weatherhead and breaker box. Meter loops must be built and installed to specifications set by the power company.

When you enroll in Net Metering, Meralco will replace your current meter and install a bi-directional meter in your home. The bi-directional meter measures both the electricity you get from the company (i.e. Import Energy) as well as the excess electricity produced by your solar installation that is exported back to it (i.e. Export Energy). Meter Base Guide. Do you need to have your meter base repaired? Need to install a new meter base? Has the city or the electricity provider notified you that your meter base needs to be repaired or upgraded? Nisat Electric can help! Many people are confused about the meter base and the electrical service panel. The meter base is the enclosure

METER INSPECT PROCEDURE. R epublic of the P hilippines ENERGY REGULATORY COMMISSION. A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life. Meralco can help you monitor your solar installation through Net-Metering, a program under RA 9513, the Renewable Energy (RE) Act that allows customers to install an RE facility within their premises up to a capacity of 100kW. Any excess electricity not consumed in the home or business is exported to a distribution utility (in this case

Thanks for staying connected. Get the latest news and service advisories from Meralco. Help us improve our service. Submit Feedback ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and …

Electrical Design Standards Meralco

Meralco meter base installation guide

ION8650 meter installation guide ION8650. 7.0 METER INSTALLATIONS SUMMARY OF SIGNIFICANT CHANGES TO THIS GUIDE (June 2019) Significant changes to the text from the last published version are identified in this document by a vertical bar in the left-hand margin (see example in the left margin of this paragraph). Additionally, significant changes to the text (by section) and to the exhibits (by exhibit) are summarized below: Section, See below for our ASSEMBLY GUIDE FOR METER POLE INSTALLATION. Meter base mounted on exterior wall of house or mobile/manufactured home. For overhead service, weather head must be a minimum of three feet above the roof. For underground service, the poured footing must be ….

Edmat How to apply for meralco residential

Meralco meter base installation guide

How to Apply for Meralco Meter and Requirements Guide. Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash 11/08/2014 · Learn the steps on how to apply for an electrical connection. Subscribe to Philippine Realty TV YouTube Channel - http://bit.ly/PhilRealtyTV Visit our websit....

Meralco meter base installation guide

  • Requirements Meralco
  • Meter Base Guide Electric Panel Installation & Repair
  • How to Apply for Meralco Meter and Requirements Guide

  • Energy UK: Guidance for electricity & gas meter installation consumer facing issues Page 1 of 57 Guidance for Electricity and Gas Meter Installation Consumer Facing Issues A guide for meter operatives on how to act and actions to take when identifying consumer facing issues May 2015 Energy UK Version: v 1.0 Status: Final published This stage includes an inspection of the Service Entrance depending on the meter set-up (2 uni-directional meter or single bi-directional meter). A Certificate of Final Electrical Inspection (CFEI), to be obtained from the city or municipality, may be required on a case-to-case basis.

    CT’s, or current transformers, and PT’s, or potential transformers are used in metering to step down current and voltage to safer and more manageable levels. Many people want to know what is a current transformer and potential transformer. Here I will try to demystify the CT PT confusion. One thing… Continue reading This stage includes an inspection of the Service Entrance depending on the meter set-up (2 uni-directional meter or single bi-directional meter). A Certificate of Final Electrical Inspection (CFEI), to be obtained from the city or municipality, may be required on a case-to-case basis.

    OH: Meters EMWP Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) 058779 Page 2 of 8 Rev. #03: 07−01−14 11. Placement of the PTs and CTs on the cluster bracket can be interchanged to suit the job application. Meter Base Installation Guides. 100 AMP / 200 AMP Overhead Service Installation (Hollywood Riser / Weatherhead Setup) 60 AMP Overhead Temporary Construction Service Installation 100 AMP Mobile Home Overhead Meter Pole Installation. 200 AMP Overhead Meter Pole Installation. Underground - H Structure Service Installation . 100 AMP / 200 AMP Underground Service Installation (On House) 400 …

    Thank you for your interest in instituting good governance practice in Meralco . If you are aware of any violation of the following corporate governance rules, committed by any our directors, officers or employees, related to the following: A service entrance houses your electric meter, and must follow Meralco technical and safety standards to ensure the safety of your home or business. You can have our certified contractors or electricians do this (click h ere for more information), or refer to your private contractor/electrician Just make sure that it complies with our standards to avoid repeating the process.

    This stage includes an inspection of the Service Entrance depending on the meter set-up (2 uni-directional meter or single bi-directional meter). A Certificate of Final Electrical Inspection (CFEI), to be obtained from the city or municipality, may be required on a case-to-case basis. Meter Base Guide. Do you need to have your meter base repaired? Need to install a new meter base? Has the city or the electricity provider notified you that your meter base needs to be repaired or upgraded? Nisat Electric can help! Many people are confused about the meter base and the electrical service panel. The meter base is the enclosure

    Meralco can help you monitor your solar installation through Net-Metering, a program under RA 9513, the Renewable Energy (RE) Act that allows customers to install an RE facility within their premises up to a capacity of 100kW. Any excess electricity not consumed in the home or business is exported to a distribution utility (in this case Thanks for staying connected. Get the latest news and service advisories from Meralco. Help us improve our service. Submit Feedback

    All meter and service equipment installations shall comply with the service requirements of CRA-ES and with rules and regulations of the inspection authorities having jurisdiction. All meter sockets and enclosures shall be listed and approved by a recognized testing lab. If any question arises for which you cannot find the answer in the following pages, it is suggested that you call CRA-ES for Installation Manual Three Phase Energy Meter For HXE310 CT & CTPT Meter Hexing Electrical Co., Ltd. www.hxgroup.cn [2013.3]

    Thank you for your interest in instituting good governance practice in Meralco . If you are aware of any violation of the following corporate governance rules, committed by any our directors, officers or employees, related to the following: 10/01/2018В В· Disclaimer : This video is just an overview of the installation, be sure to consult your local electrician / engineer before doing any upgrades or improvements to your property. This video shows

    Electrical Design Standards Wiring a meter base is the responsibility of a homeowner. Some utility companies may supply the meter base and some will not. In most cases, only the service drop and meter are installed by the utility company. The meter socket, wiring and all the fittings are the responsibility of the owner as well.

    ION8650 meter installation guide Overview The PowerLogic™ ION8650 advanced power and energy revenue meter features comprehensive logging, advanced power quality measurement, multi-protocol and multi-port communications, including IRIG-B support, and … Almost all of the Utility Companies will expect you to install the meter base, while you are wiring your structure, yet these Utility Companies will most commonly retain control of these meter bases once they energize your dwelling service by applying their seal to that meter base. After the seal is installed to protect the “their cash

    Meralco meter base installation guide

    SERVICE EQUIPMENT 5-1-1 SEPT 2015 SIM-ESIG SIM-ESIG: 5-1 METER AND SERVICE EQUIPMENT 1. General Rules and Regulations. (a) To avoid unnecessary delay or expense, the customer or the customer’s representative shall consult the appropriate DTE Electric Service Center before starting any wiring. (See pages 1-2-1 through 1-2-4 for Service Center locations.) Electrical Design Standards